{"id":5726,"date":"2023-12-03T09:37:01","date_gmt":"2023-12-03T09:37:01","guid":{"rendered":"https:\/\/md-konstrukcije.hr\/the-final-phase-of-the-muraplast-project\/"},"modified":"2024-01-16T11:12:43","modified_gmt":"2024-01-16T11:12:43","slug":"the-final-phase-of-the-muraplast-project","status":"publish","type":"post","link":"https:\/\/md-konstrukcije.hr\/en\/the-final-phase-of-the-muraplast-project\/","title":{"rendered":"THE FINAL PHASE OF THE MURAPLAST PROJECT"},"content":{"rendered":"\n<p>Our assembly team is in the final phase of building a new industrial tent for our client Muraplast d.o.o.<\/p>\n\n\n\n<p>The storage space is 28 m wide. and length 60.50 m is covered with a PVC tarpaulin that is personalized for the client with company visuals on the side and front.<\/p>\n\n\n\n<p>We have equipped the tent with an auxiliary pedestrian door, a sliding door measuring 4 m by 4.5 m, a light-transmitting roof tarp and ventilation openings covered with a mesh pvc net. <\/p>\n\n\n\n<div class=\"gallery\"><script>const galleryHTML = \"&lt;div class=\\\"gallery-image\\\" style=\\\"background-image:url(https:\/\/md-konstrukcije.hr\/wp-content\/uploads\/2023\/12\/blog-23-gallery-1.jpg)\\\">&lt;\/div>&lt;div class=\\\"gallery-image\\\" style=\\\"background-image:url(https:\/\/md-konstrukcije.hr\/wp-content\/uploads\/2023\/12\/blog-23-gallery-2.jpg)\\\">&lt;\/div>&lt;div class=\\\"gallery-image\\\" style=\\\"background-image:url(https:\/\/md-konstrukcije.hr\/wp-content\/uploads\/2023\/12\/blog-23-gallery-3.jpg)\\\">&lt;\/div>&lt;div class=\\\"gallery-image\\\" style=\\\"background-image:url(https:\/\/md-konstrukcije.hr\/wp-content\/uploads\/2023\/12\/blog-23-gallery-4.jpg)\\\">&lt;\/div>\"<\/script><div class=\"container\"><h2>Galerija<\/h2><div class=\"images\"><\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Our assembly team is in the final phase of building a new industrial tent for our client Muraplast d.o.o. The [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5281,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-5726","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/md-konstrukcije.hr\/en\/wp-json\/wp\/v2\/posts\/5726","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/md-konstrukcije.hr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/md-konstrukcije.hr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/md-konstrukcije.hr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/md-konstrukcije.hr\/en\/wp-json\/wp\/v2\/comments?post=5726"}],"version-history":[{"count":2,"href":"https:\/\/md-konstrukcije.hr\/en\/wp-json\/wp\/v2\/posts\/5726\/revisions"}],"predecessor-version":[{"id":5728,"href":"https:\/\/md-konstrukcije.hr\/en\/wp-json\/wp\/v2\/posts\/5726\/revisions\/5728"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/md-konstrukcije.hr\/en\/wp-json\/wp\/v2\/media\/5281"}],"wp:attachment":[{"href":"https:\/\/md-konstrukcije.hr\/en\/wp-json\/wp\/v2\/media?parent=5726"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/md-konstrukcije.hr\/en\/wp-json\/wp\/v2\/categories?post=5726"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/md-konstrukcije.hr\/en\/wp-json\/wp\/v2\/tags?post=5726"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}